Two gas wells put into service with capacity of half million cubic meters per day

Damascus Countryside/Homs, SANA- Ministry of Petroleum and Mineral Resources announced that two gas wells in Damascus Countryside and Homs have been put into production with a capacity of 500,000 cubic meters per day.

The gas well of Qara /3/ will produce about 400,000 cubic meters per a day and its depth reaches to 3572 meters. While the production capacity of Sadad /9/ is about 100,000 cubic meters with a depth of 3670 meters.

The opening of the two wells came as a part of the Ministry’s plans to provide the national needs of crude oil, natural gas and oil productions, especially the fuel needed for the work of power plants.

Manar/Mazen

Check Also

“Syrian pottery through ages“ within activities of Syrian Culture Days in Damascus

Damascus, SANA- Directorate-General of Antiquities and Museums held an exhibition entitled “Syrian Pottery Through Ages” …